UPGRADE-EXTENSION OF AGIOS NIKOLAOS WASTEWATER TREATMENT PLANT, CRETE, GREECE
2014-2017
Scope
Preliminary design
Detailed design – Final design for construction
Project Details
Population equivalent (PE): 14.000 people
Avg daily flow: 2.800 m³/d
Budget: 4.955.000,00€
Project owner: WATER & SEWAGE COMPANY OF AGIOS NIKOLAOS
Client: J/V SMILI S.A.– TECHNOKYKLADIKI S.A.
WWTP AT THIRASIA ISLAND (N.2000A), GREECE
2013-2017
Scope
Preliminary design
Detailed design – Final design for construction
Start Up
Project Details
Population equivalent (PE): 1.866 people
Max daily flow: 213 m³/d
Budget: 1.740.000,00€
Project owner: EGNATIA ODOS S.A. - MUNICIPALITY OF THIRA
Client: SMILI S.A.
WWTP & DISPOSAL PIPELINE AT TINOS MUNICIPALITY (N0300B), GREECE
2014-2016
Scope
Preliminary design
Detailed design – Final design for construction
Project Details
Population Equivalent (PE): 12.806 people
Avg daily flow: 5.184 m³/d
Budget: 4.875.000,00€
Project owner: EGNATIA ODOS S.A.- MUNICIPALITY OF TINOS
Client: DIATONOS S.A. - SMILI S.A.
WWTP WITH CONSTRUCTED WETLANDS METHOD AT ANTIPAROS SETTLEMENT AT CYCLADES PREFECTURE (N0900A), GREECE
2014-2016
Scope
Construction supervision
Operation consultant
Start up
Project Details
Population Equivalent (PE): 3.000 people
Avg daily flow: 480 m³/d
Budget: 1.972.000,00€
Project owner: EGNATIA ODOS S.A. - MUNICIPALITY OF ANTIPAROS
Client: J/V SMILI S.A.– EVAGGELIA ANDRIANOPOULOS & CO S.A.
CONSTRUCTION OF VACUUM SEWERAGE SYSTEM, PUMPING STATION OF PELLA & WWTP OF PELLA –NEA PELLA ALONG WITH AUTOMATION WORKS , GREECE
2013
Scope
Preliminary design
Project Details
Population Equivalent (PE): 5.500 people
Avg daily flow: 1.100 m³/d
Budget: 4.636.100,00€
Project owner: MUNICIPALITY OF PELLA
Client: GEORYTHMIKI S.A.
EXTENSION OF WWTP AT AGRINIO CITY, GREECE
2013
Scope
Preliminary design
Project Details
Population Equivalent (PE): 120.000 people
Max daily flow: 28.080 m³/d
Budget: 9.717.000,00€
Project owner: WATER & SEWAGE LOCAL AUTHORITY OF AGRINIO
Client: AAGIS S.A.
EQUIPMENT SUPPLY & E/M WORKS SUPERVISION OF THE LANDFILL’S LEACHATE TREATMENT PLANT AT ASTYPALAIA ISLAND, GREECE
2008-2010
Scope
Equipment supply & E/M works supervision
Start up
Project Details
Max daily flow: 9,40 m³/d
Budget: 1.400.906,13 € (including the landfill)
Project owner: MUNICIPALITY OF ASTYPALAIA– WATER & SEWAGE LOCAL AUTHORITY OF KOS
Client: J/V LMN S.A. – OKTANA S.A.
CONTINUATION OF TECHNICAL ASSISTANT AND SUPERVISION OF WORKS CONTRACT 2000/RO/16/P/PE/004-02 - TIMISOARA WWTP REHABILITATION, ROMANIA
2008-2009
Scope
Technical Assistant
Project Details
Population Equivalent (PE): 440.000 people
Avg flow: 2.400 l/sec
Budget: 45.363. 012€
Project owner: MUNICIPALITY OF TIMISOARA
Client: EPTISA ROMANIA SRL
SEWERAGE SYSTEM & FORCE MAIN – WWTP AT PALEROS MUNICIPALITY, GREECE
2008-2012
Scope
Detailed design –Final design for construction
Project Details
Population Equivalent (PE): 20.000 people
Avg flow: 4.000 m³/h
Budget: 10.000.000,00€ (including sewerage pipeworks)
Project owner: MUNICIPALITY OF PALEROS
Client: J/V G. TH. LADOPOULOS S.A. – IONAS TECHNIKI S.A.
EQUIPMENT SUPPLY & E/M WORKS SUPERVISION OF THE WWTP AT ASTYPALAIA ISLAND, GREECE
2008-2010
Scope
Equipment supply & E/M works supervision
Start up
Project Details
Population Equivalent (PE): 4.114 people
Max daily flow: 1.275,34 m³/d
Budget: 2.313.313,66€
Project owner: MUNICIPALITY OF ASTYPALAIA– WATER & SEWAGE LOCAL AUTHORITY OF KOS
Client: J/V LMN S.A. – OKTANA S.A.
WWTP & EFFLUENT SUBMERGED DISPOSAL PIPE AT KARDAMENA'S MUNICIPAL DISTRICT, GREECE
2006-2009
Scope
Preliminary design
Detailed design
Final detailed design & Construction supervision
Project Details
Population Equivalent (PE): 30.689 people
Max flow: 201,39 l/sec
Budget: 10.339.500,00€
Project owner: MUNICIPALITY OF HERAKLIDON
Client: J/V DOMOSTATIKI S.A. – J. TROUVAS
REHABILITATION OF TIMISOARA WWTP ISPA PROJECT 2000/RO/16/P/PE/004-02 -TECHNICAL ASSISTANT, ROMANIA
2007-2008
Scope
Technical Assistant
Project Details
Population Equivalent (PE): 440.000 people
Avg flow: 2.400 l/sec
Budget: 45.363.012€
Project owner: MUNICIPALITY OF TIMISOARA
Client: PWT WASSER & ABWASSERTECHNIK
WWTP & EFFLUENT SUBMERGED DISPOSAL PIPE AT THRIASIO AREA, GREECE
2007-2008
Scope
Technical Consultant
Project Details
Population Equivalent (PE): 117.000 people
Avg design flow: 42.000 m³/d
Budget: 67.806.077,40€
Project owner: ATHENS WATER SUPPLY AND SEWERAGE COMPANY (EYDAP S.A.)
Client: ADK CONSULTING ENGINEERS S.A.
WASTEWATER COLLECTION, TRANSFER, TREATMENT & DISPOSAL AT PAIANIA- KOROPI AREA, GREECE
2010-2015
Scope
Preliminary design
Detailed design – Final design for construction
Project Details
Population Equivalent (PE): 136.667 people
Max daily flow: 32.760 m³/d
Budget: 62.726.948,08€
Project owner: ATTICA REGION
Client: J/V KLEARHOS G. ROUTSIS S.A. – ERETVO S.A. – AAGIS S.A.