UPGRADE-EXTENSION OF AGIOS NIKOLAOS WASTEWATER TREATMENT PLANT, CRETE, GREECE

2014-2017

Scope

Preliminary design

Detailed design – Final design for construction

Project Details

Population equivalent (PE): 14.000 people

Avg daily flow: 2.800 m³/d

Budget: 4.955.000,00€

Project owner: WATER & SEWAGE COMPANY OF AGIOS NIKOLAOS

Client: J/V SMILI S.A.– TECHNOKYKLADIKI S.A.

WWTP AT THIRASIA ISLAND (N.2000A), GREECE

2013-2017

Scope

Preliminary design

Detailed design – Final design for construction

Start Up

Project Details

Population equivalent (PE): 1.866 people

Max daily flow: 213 m³/d

Budget: 1.740.000,00€

Project owner: EGNATIA ODOS S.A. -  MUNICIPALITY OF THIRA

Client: SMILI S.A.

WWTP & DISPOSAL PIPELINE AT TINOS MUNICIPALITY (N0300B), GREECE

2014-2016

Scope

Preliminary design

Detailed design – Final design for construction

Project Details

Population Equivalent (PE): 12.806 people

Avg daily flow: 5.184 m³/d

Budget: 4.875.000,00€

Project owner: EGNATIA ODOS S.A.- MUNICIPALITY OF TINOS

Client: DIATONOS S.A. - SMILI S.A.

WWTP WITH CONSTRUCTED WETLANDS METHOD AT ANTIPAROS SETTLEMENT AT CYCLADES PREFECTURE (N0900A), GREECE

2014-2016

Scope

Construction supervision

Operation consultant

Start up

Project Details

Population Equivalent (PE): 3.000 people

Avg daily flow: 480 m³/d

Budget: 1.972.000,00€

Project owner: EGNATIA ODOS S.A. - MUNICIPALITY OF ANTIPAROS

Client: J/V SMILI S.A.– EVAGGELIA ANDRIANOPOULOS & CO S.A.

CONSTRUCTION OF VACUUM SEWERAGE SYSTEM, PUMPING STATION OF PELLA & WWTP OF PELLA –NEA PELLA ALONG WITH AUTOMATION WORKS , GREECE

2013

Scope

Preliminary design

Project Details

Population Equivalent (PE): 5.500  people

Avg daily flow: 1.100 m³/d

Budget: 4.636.100,00€

Project owner: MUNICIPALITY OF PELLA

Client: GEORYTHMIKI S.A.

EXTENSION OF WWTP AT AGRINIO CITY, GREECE

2013

Scope

Preliminary design

Project Details

Population Equivalent (PE): 120.000 people

Max daily flow: 28.080 m³/d

Budget: 9.717.000,00€

Project owner: WATER & SEWAGE LOCAL AUTHORITY OF AGRINIO 

Client: AAGIS S.A.

EQUIPMENT SUPPLY & E/M WORKS SUPERVISION OF THE LANDFILL’S LEACHATE TREATMENT PLANT AT ASTYPALAIA ISLAND, GREECE

2008-2010

Scope

Equipment supply & E/M works supervision

Start up

Project Details

Max daily flow: 9,40 m³/d

Budget: 1.400.906,13 € (including the landfill)

Project owner: MUNICIPALITY OF ASTYPALAIA– WATER & SEWAGE LOCAL AUTHORITY OF KOS

Client: J/V LMN S.A. – OKTANA S.A.

CONTINUATION OF TECHNICAL ASSISTANT AND SUPERVISION OF WORKS CONTRACT 2000/RO/16/P/PE/004-02 - TIMISOARA WWTP REHABILITATION, ROMANIA

2008-2009

Scope

Technical Assistant

Project Details

Population Equivalent (PE): 440.000 people

Avg flow: 2.400 l/sec

Budget: 45.363. 012€

Project owner: MUNICIPALITY OF TIMISOARA

Client: EPTISA ROMANIA SRL

SEWERAGE SYSTEM & FORCE MAIN – WWTP AT PALEROS MUNICIPALITY, GREECE

2008-2012

Scope

Detailed design –Final design for construction

Project Details

Population Equivalent (PE): 20.000 people

Avg flow: 4.000 m³/h

Budget:  10.000.000,00€ (including sewerage pipeworks)

Project owner: MUNICIPALITY OF PALEROS

Client: J/V G. TH. LADOPOULOS S.A. – IONAS TECHNIKI S.A.

EQUIPMENT SUPPLY & E/M WORKS SUPERVISION OF THE WWTP AT ASTYPALAIA ISLAND, GREECE

2008-2010

Scope

Equipment supply & E/M works supervision

Start up

Project Details

Population Equivalent (PE): 4.114 people

Max daily flow: 1.275,34 m³/d

Budget: 2.313.313,66€

Project owner: MUNICIPALITY OF ASTYPALAIA– WATER & SEWAGE LOCAL AUTHORITY OF KOS

Client: J/V LMN S.A. – OKTANA S.A.

WWTP & EFFLUENT SUBMERGED DISPOSAL PIPE AT KARDAMENA'S MUNICIPAL DISTRICT, GREECE

2006-2009

Scope

Preliminary design

Detailed design

Final detailed design & Construction supervision

Project Details

Population Equivalent (PE): 30.689 people

Max flow: 201,39 l/sec

Budget: 10.339.500,00€

Project owner: MUNICIPALITY OF HERAKLIDON 

Client: J/V DOMOSTATIKI S.A. – J. TROUVAS

REHABILITATION OF TIMISOARA WWTP ISPA PROJECT 2000/RO/16/P/PE/004-02 -TECHNICAL ASSISTANT, ROMANIA

2007-2008

Scope

Technical Assistant

Project Details

Population Equivalent (PE): 440.000 people

Avg flow: 2.400 l/sec

Budget: 45.363.012€

Project owner: MUNICIPALITY OF TIMISOARA

Client: PWT WASSER & ABWASSERTECHNIK

WWTP & EFFLUENT SUBMERGED DISPOSAL PIPE AT THRIASIO AREA, GREECE

2007-2008

Scope

Technical Consultant

Project Details

Population Equivalent (PE): 117.000 people

Avg design flow: 42.000 m³/d

Budget: 67.806.077,40€

Project owner: ATHENS WATER SUPPLY AND SEWERAGE COMPANY (EYDAP S.A.)

Client: ADK CONSULTING ENGINEERS S.A.

WASTEWATER COLLECTION, TRANSFER, TREATMENT & DISPOSAL AT PAIANIA- KOROPI AREA, GREECE

2010-2015

Scope

Preliminary design

Detailed design – Final design for construction

Project Details

Population Equivalent (PE): 136.667 people

Max daily flow: 32.760 m³/d

Budget: 62.726.948,08€

Project owner: ATTICA REGION

Client: J/V KLEARHOS G. ROUTSIS  S.A. – ERETVO S.A. – AAGIS S.A.