DESIGN, CONSTRUCTION & MAINTENANCE OF INFRASTRUCTURE OF THE INTEGRATED WASTE MANAGEMENT SYSTEM AT WESTERN MACEDONIA REGION BY PUBLIC PRIVATE PARTNERSHIP (PPP), GREECE

2015

Scope

Detailed design of Wastewater treatment plant

Project Details

Nominal capacity: 179.0 m³/day

Budget: 49.000.000€

Project owner: HELECTOR S.A.

Client: ZITA TECHNOLOGIES LTD

CONSTRUCTION OF COUNTY WASTE MANAGEMENT CENTRE KASTIJUN, COUNTY OF ISTRIA, CROATIA

2014-2015

Scope

Detailed electrical design of Wastewater Treatment Plant & Sludge Management

Project Details

Nominal capacity: 330 m³/day

Budget: 35.070.000€

Project owner: HELECTOR S.A.

Client: ZITA TECHNOLOGIES LTD

INTEGRATED SYSTEM OF SOLID WASTE TREATMENT FACILITIES OF SOFIA MUNICIPALITY, BULGARIA

2014

Scope

Detailed design of a Mechanical - Biological Treatment (MBT) Plant For Processing Waste

Project Details

Nominal capacity: 390.4 m³/day

Budget: 177.523.926,52€

Project owner: HELECTOR S.A.

Client: ZITA TECHNOLOGIES LTD

CONSTRUCTION OF COUNTY WASTE MANAGEMENT CENTRE MARIŠĆINA, PRIMORSCO – GARANSCA COUNTY, CROATIA

2013-2014

Scope

E/M detailed design of Wastewater Treatment Plant

Start up (hot commissioning plan) procedures preparation of Wastewater Treatment Plant

Project Details

Nominal capacity: 424,7 m³/d

Budget: 1.501.000€

Project owner: HELECTOR S.A.

Client: ZITA TECHNOLOGIES LTD

SOLID MUNICIPAL WASTE TREATMENT OF ELEFSINA MUNICIPALITY BOT, GREECE

2010

Scope

Feasibility study

Detailed design 

Project Details

Nominal capacity: 40.000 t/year

Biowaste-green bins 30 t/day

Packaging Materials - blue bins 5,5 t/day

Project owner: MUNICIPALITY OF ELEFSINA

Client: ALKTIR S.A.

EQUIPMENT SUPPLY & E/M WORKS SUPERVISION OF THE LANDFILL’S LEACHATE TREATMENT PLANT AT ASTYPALAIA ISLAND, GREECE

2008-2010

Scope

Equipment supply & E/M works supervision & project management

Project Details

Max daily flow: 9,40 m³/d

Budget (2008): 1.400.906,13€

Project owner: MUNICIPALITY OF ASTYPALAIA– WATER & SEWAGE LOCAL AUTHORITY OF KOS

Client: J/V LMN S.A. – OKTANA S.A.

DESIGN-CONSTRUCTION OF A SLUDGE THERMAL DRYING PLANT AT THESSALONIKI WWTP, GREECE

2008

Scope

Preliminary design

Project Details

Max evaporation capacity: 4.600 KgH2O/hr

Budget: 17.700.000€

Project owner: SPECIAL SERVICE FOR WATER SUPPLY AND SEWERAGE OF THESSALONIKI (E.Y.D.E. THESSALONIKIS)

Client: J/V KASTOR S.A. – ETETH S.A.

SOLID WASTE TREATMENT PLANT , GREECE

2007-2008

Scope

Preliminary design

Detailed design

Final design for construction

Project Details

Nominal Capacity: 75.000 t/year

Budget: 20.000.000€

Project owner: UNITED WASTE MANAGEMENT ASSOCIATION OF CRETE (ΕSDAK)

Client: MESOGEOS S.A.

PSYTALIA WWTP SLUDGE THERMAL DRYING PLANT, GREECE

2005

Scope

Preliminary design

Project Details

Nominal capacity: 800 t/day

Budget (2005): 34.862.385€

Project owner: ATHENS WATER SUPPLY AND SEWERAGE COMPANY (EYDAP S.A.)

Client: EDRASIS S.A.

COLLECTION AND TREATMENT OF LEACHATE AT WESTERN ATTICA LANDFILLS, GREECE

2004

Scope

Preliminary design

Project details

Nominal capacity: 700 m³/day

Budget (2004): 1.970.410,32€

Project owner: ASSOCIATION OF ATTICA MUNICIPALITIES

Client: ENVIPROSYSTEMS S.A.

SOLID WASTE TREATMENT PLANT, COMPOST PRODUCTION PLANT AND SANITARY LANDFILL AT AKROTIRI CHANIA REGION (CRETE), GREECE

2001

Scope

Preliminary design

Project Details

Nominal capacity: 50.000 t/year

Budget (2001): 2.348.000€

Project owner: PREFECTURE OF CHANIA 

Client: J/V EDRASI S.A. TOMES S.A. - KRUGER SA

SOLID WASTE RECYCLING PLANT AT ANO LIOSIA, GREECE

1998-1999

Scope

Preliminary design

Project planning & Project management team participation

Project Details

Nominal capacity: 1.200 t/day

Budget (1998): 45.640.000€

Project owner: MINISTRY OF ENVIRONMENT AND PUBLIC WORKS

Client: J/V KRUGER AS-OTVD - A. ZACHAROPOULOS S.A. - CORONIS S.A.-ΕNVITEC S.A. - A. KATSAMPES

SOLID WASTE TREATMENT PLANTS